Master Data in SAP PM

17 Pivotal Master Data in SAP PM | 14 Consulting Tips |

17 Important Master Data in SAP PM

14 Consulting Tips

Introduction

Master data in SAP PM is the highest in count than any other module. Master data makes the life of an end user easy. Certainly it can full fill all maintenance business processes needs. Significantly there are seventeen master data objects in PM module. Each has its own benefit and importance. You can click on each of them to know the details.

SAP PM Master Data list

Consulting Tips (Things to remember)

During design phase you must remember following points:

  • Dependency of master data on each other must be explained to client.
    • Bill of material cannot be created without material master.
    • Measuring points and counter has dependency on equipment, functional location and characteristics.
    • Serial number has dependency on material master and equipment.
    • Equipment and functional location has dependency on Main work center
  • Always explain the difference between equipment and functional location to business.
  • Compare the use of equipment and functional location from business point of view.
  • Clarify the importance of number range of equipment (external and internal).
  • Give demo of measuring points and counter. Tell business about the warning and error message when a reading goes beyond permissible limit.
  • Use of construction type in maintenance order processing is equally important.
  • Another key point is demo of permits and its control on maintenance order processing.
  • Explain how class and characteristics can show the specifications of machinery.
  • Catalog code and catalog profile in sap pm can do wonders in notification processing. Therefore, give a notification processing demo and related reports.
  • Material master needs coordination with MM and FICO modules. Target to finish it at early stage.
  • Maintenance plan category can control triggering of maintenance call object. This must be explain and finalized in design phase.
  • Task list needs a well structure program to upload. There is a possibility that business wants to upload long text also. So it is better to identify such thing early. Plan tasks for ABAP programmer in advance.
  • Not to mention that serial number is used in refurbishment process.
  • Master inspection characteristics are assigned to task list operations and used in Calibration process

You can also get some good stuff on master data here also.

error: Content is protected !!